holmes7 Inviato 18 Giugno 2013 Segnala Condividi Inviato 18 Giugno 2013 (modificato) http://qz.com/86988/spain-just-spent-680-million-on-a-submarine-that-cant-swim/ http://www.defensenews.com/article/20130605/DEFREG01/306050017/Navantia-Gets-US-Help-Fix-Overweight-Sub An engineering error caused the submarine to be 75 tons overweight, making it unable to resurface if it submerged, a Spanish industrial source said. To tackle the weight problem, Electric Boat — owned by General Dynamics — was brought in by Navantia to help nail down the problems and find a solution. EB, long the lead design shipyard for US submarines, is familiar with the S-80 program through a foreign military sales contract from the US Navy in support of the Spanish Defense Ministry. It also provided extensive assistance to BAE Systems a decade ago during construction and design problems with Britain’s Astute-class nuclear submarines. 75 Tonnellate? Ne hanno da smaltire di peso! Modificato 18 Giugno 2013 da holmes7 Link al commento Condividi su altri siti Altre opzioni di condivisione...
-{-Legolas-}- Inviato 18 Giugno 2013 Segnala Condividi Inviato 18 Giugno 2013 Ci sarà materiale per lamette in abbondanza! Link al commento Condividi su altri siti Altre opzioni di condivisione...
Messaggi raccomandati
Crea un account o accedi per lasciare un commento
Devi essere un membro per lasciare un commento
Crea un account
Iscriviti per un nuovo account nella nostra community. È facile!
Registra un nuovo accountAccedi
Sei già registrato? Accedi qui.
Accedi Ora